Is it possible to run previous versions of a Flow ...
# prefect-community
j
Is it possible to run previous versions of a Flow from the UI? I keep seeing
This flow is archived and cannot be run
, when I flip back to an old version. Wanted to make sure that’s always expected and I’m not just doing something wrong when registering new versions of the flow.
1
b
Hi Josh, that is correct. Previous versions of a flow are archived, and cannot be run again.
👍 1