Hi, not sure whether this is related to overall dashboard, or flow dashboard. But for me it is very valuable to see task status presented in dependency graph. I have been thinking it can be a good idea for the flow run dashboard to have a tab with timelines but without any links (as you have right now) and another version with connections but each task represented as a dot. This way long running tasks does not overload the visualization and you can see the dependency much better. In a way this is the same as flow run dashboard at prefect 1 was. happy to provide more details if needed